Shop No. 4, NH-4 Bypass Service Road, Hiriyur, KA 577598
Mon - Sat: 8:30 AM - 7:00 PM
Financial Settlements & Material Procurement

Refund and Cancellation Policy

This policy delineates the financial and operational terms governing cancellations, advance payment disbursements, work-in-progress valuations, and wholesale material returns across civil construction, industrial EPC, and building-material supply contracts with PEERS URBAN CREW CONSTRUCTIONS PRIVATE LIMITED.

Effective Date: October 12, 2026
Last Updated: October 12, 2026
Entity: PEERS URBAN CREW CONSTRUCTIONS PRIVATE LIMITED
Notice for Financial & Operational Verification
Settlement timelines and banking reconciliation processes outlined herein reflect standard Indian construction industry frameworks and contract law. Individual project agreements may specify custom stage milestones, retention money schedules, and supplier commitment clauses which govern individual customer accounts.
Section 01

The Four-Tier Commercial Engagement Hierarchy

Unlike retail e-commerce transactions, heavy civil engineering, industrial EPC construction, and bulk commodity procurement involve significant front-loaded commitments, including architectural drafting, engineering man-hours, equipment leases, specialized labor mobilization, and heavy transport bookings.

To avoid ambiguity, PEERS URBAN CREW CONSTRUCTIONS PRIVATE LIMITED clearly distinguishes between four distinct commercial stages, each carrying specific cancellation rights and refund liabilities:

Engagement Stage Legal Nature Financial Commitment Cancellation & Refund Status
Stage 1: Website Enquiry / Consultation Informal contact request Zero (100% Free) Full Cancellation: Client can withdraw at any time with zero financial liability.
Stage 2: Quotation / Preliminary BOQ Non-binding commercial estimate None (unless a separate preliminary survey fee was contracted) No Penalty: Quotation lapses upon expiration date. No payment or refund required.
Stage 3: Confirmed Purchase Order (PO) Binding agreement for material supply Material advance or credit commitment Conditional: Governed by dispatch status, factory hold costs, and restocking parameters.
Stage 4: Executed EPC / Construction Contract Bilateral signed civil contract Mobilization advance and milestone disbursements Governed by Agreement: Dependent on certified work done, unrecoverable site expenses, and contractual exit terms.
Section 02

Website Enquiries & Consultation Requests

Submitting an inquiry through our online cost estimator, quotation request forms, telephone line, or WhatsApp chat is entirely free of charge. No monetary payment is collected through our website.

Prospective clients may freely withdraw, adjust, or cancel their consultation request at any time prior to signing a formal agreement without incurring any cancellation fees, penalties, or damages whatsoever.

Section 03

Cancellation Prior to Execution of a Formal Written Agreement

In cases where a client provides an initial intent token or preliminary earnest deposit to commission customized pre-construction services—such as topographic drone surveys, soil bearing capacity (SBC) geotechnical testing, custom architectural blueprints, or municipal liaison paperwork—prior to executing a full EPC agreement:

  • Notice of Withdrawal: The client may cancel by issuing formal written notification via email to contact@peersurbancrewconstruction.com before execution of the final agreement.
  • Refund Assessment: The client is entitled to a refund of the unutilized balance of the preliminary deposit, strictly after deducting documented third-party disbursements and verified direct engineering costs incurred up to the timestamp of written cancellation notice (e.g. government challan fees paid for land zoning verification, soil laboratory testing charges, and architect drafting man-hours).
  • Deliverable Handover: All survey reports, laboratory test results, and drawings drafted up to the date of cancellation will be handed over to the client upon settlement of accounts.
Section 04

Cancellation After Execution of a Construction / Project Agreement

Once an Engineering, Procurement, and Construction (EPC) contract, Turnkey Agreement, or Work Order has been formally signed by both parties, project execution is set in motion.

In the event of unilateral termination or cancellation requested by the Client:

Governing Contract Primacy

REFUND ELIGIBILITY AND CANCELLATION CHARGES ARE DETERMINED PRIMARILY BY THE SPECIFIC TERMINATION CLAUSE OF YOUR EXECUTED CONTRACT, RELEVANT SUPPLIER COMMITMENTS, AND APPLICABLE INDIAN CONTRACT LAW. We do not operate on an arbitrary universal refund percentage. The final financial settlement is governed by joint physical measurement of completed work, verified vendor liabilities, and unspent milestone advances.

Upon receipt of a written cancellation request under an executed project contract:

  1. Immediate Cessation of Work: All ongoing construction, earthmoving, and site activities will be safely demobilized within 48 to 72 hours, securing the site against structural or monsoon damage.
  2. Notice to Subcontractors & Suppliers: All procurement orders and subcontractor work streams will be frozen to mitigate further expenditure.
Section 05

Work-in-Progress (WIP) Valuation & Allowable Deductions

Within fourteen (14) business days of site work stoppage, a joint site inspection shall be conducted by our principal project engineer and the client's authorized technical representative to record final certified measurements.

The following verified expenditures are strictly non-refundable and shall be deducted from any advance payments held by the Company:

  • Completed Civil Works: Full value of all structural, foundation, masonry, plastering, or finishing works executed up to the stoppage date, calculated using contractual BOQ item rates.
  • Mobilization & Site Setup: Site clearing, temporary labor camp erection, perimeter security fencing, water and electrical connections, scaffolding erection, and earthmoving equipment mobilization already incurred.
  • Materials Procured or In-Transit: Cost of all raw materials delivered to the site or in transit that cannot be returned or repurposed without financial loss.
  • Demobilization Charges: Actual equipment dismantle costs, crane relocation expenses, and safety shuttering needed to leave the site in a hazard-free state.
  • Unrecoverable Statutory Taxes: Non-reclaimable GST and cess paid to government revenue authorities on billed milestones.
Section 06

Wholesale Construction Material Supply: Cancellation Rules

For high-volume wholesale material orders (TMT Steel, Bulk Cement, Aggregates, Sand, AAC Blocks):

6.1 Cancellation Prior to Yard Loading / Factory Dispatch

If the buyer submits a cancellation request before the consignment has been loaded onto transport trailers or released from manufacturer factory dispatch:

  • Standard commodity orders may be cancelled subject to an administrative processing and booking hold deduction (reflecting depot staging costs).
  • The net balance advance is refundable via electronic bank transfer.

6.2 Cancellation After Dispatch or While In-Transit

Once tippers, transit mixers, or flatbed trailers have received loading gate passes and departed the dispatch depot/factory:

  • No In-Transit Cancellation: Material shipments in transit cannot be cancelled due to high transit logistics costs, freight commitments, and weighbridge declarations under Indian GST e-Way Bill regulations.
  • Refusal of Delivery: If a buyer unlawfully refuses delivery at the designated site, the buyer remains liable for the full transport freight, transit insurance, vehicle detention/demurrage fees, and depot return restocking costs.
Section 07

Custom-Fabricated & Non-Returnable Construction Materials

Certain building materials undergo specialized customization or have rigid chemical setting parameters that render them completely unusable for other projects.

Strictly Non-Returnable & Non-Cancellable Items

Under no circumstances are the following materials eligible for return or cancellation once fabrication or batching has commenced:

  • Ready-Mix Concrete (RMC): Perishable perishable matrix with strict hydration setting times. Non-cancellable once raw ingredients enter the transit mixer drum at the batching plant.
  • Custom Cut & Bent TMT Rebars: Rebar bent to custom structural bar-bending schedules (BBS) unique to client blueprints.
  • Pre-Engineered Building (PEB) Structural Steel: Custom-welded beams, rafters, purlins, and engineered anchor bolts manufactured to project dimensions.
  • Special Order Quarry Cuts: Non-standard dimension stone, architectural granite slabs, or special concrete additives procured on specific client indent.
Section 08

Defective, Damaged or Non-Conforming Materials Protocol

PEERS URBAN CREW CONSTRUCTIONS PRIVATE LIMITED is committed to stringent quality assurance in accordance with Indian Standards (IS Codes). If delivered materials are defective or do not match agreed Purchase Order specifications:

  1. Mandatory Delivery Inspection: The client's authorized site engineer must inspect consignments prior to complete unloading. Any visible damage, water-caked cement bags, or sub-standard aggregate gradation must be immediately noted in writing on the driver's Delivery Challan.
  2. Defect Notification Period: Written notification with supporting photographs and mill test certificate references must be sent to contact@peersurbancrewconstruction.com within twenty-four (24) hours of arrival.
  3. Remediation Options: Upon verification by our technical inspector:
    • We will arrange prompt replacement of defective materials at our cost within 48 to 72 hours; OR
    • Issue an official credit note / refund for the exact verified non-conforming quantity if replacement cannot be delivered within acceptable project schedules.

Materials that have already been incorporated into permanent concrete structures, altered, contaminated on site due to improper customer storage (e.g. cement stored in unroofed damp spaces), or damaged through client mishandling are not eligible for rejection, replacement, or refund.

Section 09

Advance Payments, Milestone Retentions & Refund Deductions

In heavy civil contracting, advance payments (mobilization advances) serve as working capital to book factory production queues and position plant fleets.

Our policy establishes a balanced, legally sound approach:

  • No Automatic Total Forfeiture: We do not claim that all client advance payments are universally non-refundable. If verifiable unspent capital remains after all project liabilities are discharged, the surplus belongs to the client.
  • No Unconditional 100% Refunds: Conversely, advance payments are not unconditionally refundable on demand once operational mobilization has commenced.
  • Settlement Equation:
    Refund Balance = (Total Client Advances Received) − (Value of Certified Work Completed + Verified Unavoidable Supplier Commitments + Demobilization & Site Restoration Costs + Applicable Administrative and Transaction Overheads).
Section 10

Refund Processing Methods & Banking Timelines

Once a joint final statement of account is finalized and mutually signed:

  • Discharge Agreement: Both parties shall execute a mutual No-Claims Discharge Certificate confirming that all project claims, liens, and disputes are fully resolved.
  • Payment Method: Approved refunds are remitted solely via traceable electronic banking channels (RTGS, NEFT, or direct IMPS transfer) directly to the verified corporate or individual bank account from which original funds were received. Cash refunds are strictly prohibited under Indian anti-money laundering and Income Tax regulations.
  • Standard Banking Timelines: Following execution of the discharge certificate, approved refunds are processed within fourteen (14) to twenty-one (21) business days, allowing for interbank clearing cycles.
Section 11

Procedure for Submitting a Formal Cancellation or Refund Request

To ensure legal validity and prevent processing delays, all cancellation notices and refund claims must be submitted in writing. Telephone or informal chat messages do not trigger formal cancellation.

Step-by-Step Submission Procedure:

  1. Send Official Notice: Email an official written cancellation letter from your registered email ID to contact@peersurbancrewconstruction.com with the subject line format:
    "CANCELLATION REQUEST – [Contract / PO Reference Number] – [Project / Site Name]".
  2. Include Required Supporting Documents:
    • Copy of original Work Order, Purchase Order, or signed EPC Contract.
    • Official bank payment receipts and UTR reference numbers for all advances transferred.
    • For material claims: delivery challan numbers, computer weighbridge slips, and photographic documentation of defects.
    • Cancelled cheque or verified bank details matching the original payer name.
  3. Acknowledgement & Audit: Our accounts and engineering departments will acknowledge receipt within two (2) business days and schedule the final joint measurement audit.
Section 12

Statutory Consumer Protections & Applicable Indian Law

Nothing in this Refund and Cancellation Policy is intended to limit, exclude, or override any mandatory legal protections or non-waivable consumer rights provided under the Indian Contract Act, 1872, the Sale of Goods Act, 1930, or the Consumer Protection Act, 2019.

Where any provision of this policy is found to conflict with mandatory statutory consumer law, the applicable statutory law shall govern to the extent of such conflict, while the remaining terms of this policy shall remain valid and binding.

Need Assistance with Billing or Cancellation?

Our commercial billing and dispute resolution team is available to assist you with order modifications, invoice reconciliations, or settlement questions.

PEERS URBAN CREW CONSTRUCTIONS PRIVATE LIMITED
Shop No. 4, NH-4 Bypass Service Road, Hiriyur, Karnataka 577598, India